Vietnam’s Thang Long Project Management Unit has approved the award of a consultancy contract to a SYSTRA-led consortium of French, Vietnamese and South Korean firms, which will deliver the studies and tender documents for the 350km/h line between Hanoi and Ho Chi Minh City.

Screenshot 2026-11-26 095423

SYSTRA to lead Vietnam high-speed railway studies

Credit: SYSTRA

SYSTRA has been selected to lead an eight-company international consortium to carry out studies for Vietnam’s planned North–South high-speed railway, a new 1,541km line linking Hanoi and Ho Chi Minh City.

The Thang Long Project Management Unit, the public agency tasked by Vietnam’s Ministry of Construction with preparing and managing the project, officially approved the award of the consultancy contract on 22 November 2026.

Consortium to deliver feasibility studies and FEED

Alongside SYSTRA, the consortium includes four Vietnamese companies, TEDI, TEDI SOUTH, TRICC and Hoang Long, and three South Korean partners: Sambo Engineering, Yooshin Engineering Corporation and Korea National Railway (KNR).

The consortium will be responsible for geotechnical surveys, feasibility studies, Front-End Engineering Design (FEED) and the preparation of tender documents. The 30-month assignment will help establish the railway’s technical and economic foundations.

According to SYSTRA, the studies will inform major decisions on the route alignment, station locations, infrastructure, railway technologies and investment arrangements.

SYSTRA is taking an important step forward in its development in Vietnam: we are strengthening our presence by drawing on our international high-speed rail expertise to help develop local talent and the future of mobility across the country.”

A 350km/h line crossing 15 provinces

The railway will run from Ngoc Hoi station in Hanoi to Thu Thiem station in Ho Chi Minh City. The project involves building a new double-track line crossing 15 provinces and cities, with a design speed of 350km/h, 23 passenger stations and five freight stations.

Once operational, the line is expected to cut journey times between Vietnam’s two largest cities to approximately five and a half hours, compared with around 30 hours today. The project also aims to support economic development and provide a more sustainable alternative for long-distance travel.

Building on SYSTRA’s work in Vietnam

SYSTRA has contributed to transport infrastructure development in Vietnam for more than 20 years. The group played a key role in Hanoi Metro Line 3, whose first elevated section opened in 2024, and contributed to the design of Ho Chi Minh City Metro Line 1.

More recently, it has secured several high-speed rail assignments on the Hanoi–Quang Ninh and Ben Thanh–Can Gio projects. In January 2026, the group established SYSTRA Vietnam, a permanent local subsidiary.

Jean-Charles Vollery, CEO of the SYSTRA Group, said: “With this new assignment, SYSTRA is taking an important step forward in its development in Vietnam: we are strengthening our presence by drawing on our international high-speed rail expertise to help develop local talent and the future of mobility across the country.”

SYSTRA says it currently has 50 high-speed rail projects underway worldwide. The consortium’s studies will lay the groundwork for tendering the North–South project.