news
HS2 have begun working on the 2.7km Greatworth green tunnel…
13 September 2023 | By Elliot Robinson (Editorial Assistant - Global Railway Review)
HS2 have begun working on the 2.7km Greatworth green tunnel which will be built on the surface before being covered by earth, trees and shrubs to fit in with the countryside.