Passenger satisfaction in London Overground continues to soar since being taken over by the Mayor
28 June 2012 | By
Passenger satisfaction at 90%, compared to 82% average in London and South East...
List view / Grid view
28 June 2012 | By
Passenger satisfaction at 90%, compared to 82% average in London and South East...
1 March 2012 | By Charles Whalley Advertising Limited
The new East London Line Railway is nearing completion...
6 December 2011 | By Steve Murphy, Managing Director, London Overground Rail Operations Ltd (LOROL)
In the four years since the launch of London Overground the team behind the unique operator-client partnership has transformed the network into a modern, reliable metro railway that London can be proud of as it prepares to host the 2012 Olympics. Significant investment by Transport for London (TfL), the transport…
28 February 2011 | By Transport for London
Rail link allows passengers to move swiftly between north London, the City, Docklands & the south of the capital opened three months ahead of schedule...
22 December 2010 | By Network Rail
A long-term strategy for London’s railway has been unveiled, setting out the steps needed to cater for increasing demand for rail travel.
15 July 2010 | By TfL
A million extra journeys are being made each week using Oyster pay as you go on National Rail after it was extended to all 350 National Rail stations...
30 July 2007 | By Douglas Oakervee, Executive Chairman of Cross London Rail Links Limited
Cross London Rail Links’ proposals for a major new railway for London and the south of the UK, with benefits for the whole of the country, continue to move steadily through the parliamentary process towards construction. Proposed in 1999 as part of a central London rail study (following a prior…