List view / Grid view

High-Speed Rail

 

High-speed railways provide an efficient mode of transport, but they are highly complex systems and must combine various elements if they are to operate successfully.

Our high-speed rail content explores projects currently under construction, projects at planning stages and how their vision is taking shape, the funding and financial issues around building new high-speed lines, the importance of understanding what passengers want from high-speed rail services, and how established high-speed lines can help boost economies.

article

The need for speed

28 November 2006 | By Giovanni Costa, Responsible for the High-Speed/High-Capacity Net Project of the Financial Division of RFI

The Italian transport system is strongly unbalanced in favour of the road and motorway network. Giovanni Costa, Responsible for the High-Speed/High-Capacity Net Project of the Financial Division of RFI, explained to the Global Railway Review that the constant growing demand for the movement of persons and freight is fulfilled increasingly…

article

ERTMS implementation in Greece

28 November 2006 | By Ioannis G. Protopapas, Head of Railway Systems Department, ERGOSE S.A.

Though the Greek Railway Network is located far off Central Europe, ERGOSE S.A.1 is speeding up the efforts to comply with the interoperability requirements set by the European Community to facilitate unhindered, at least by technical barriers, cross-border operations at a European level and to introduce the technological evolutions of…

article

The Figueras-Perpignan High-Speed Line

15 September 2006 | By Ramon Conde, Marketing and Communications Director, TP Ferro

Historically, the Pyrenees have acted as a natural barrier for the communications between France and Spain, concentrating them at both extremes of the mountain range, through the coastal plains. The increasing cross-border traffic flow has produced consequent traffic congestion. In 1992, the governments of France and Spain started detailed discussions…

article

High-speed and GSM-R: Portuguese overview

28 July 2006 | By Eduardo Frederico, Director of Engineering, RAVE

By decision of the Portuguese Government, a High Speed Transportation System shall be developed which offers both international high-speed and national high-speed train services (passenger and freight) accommodating the increasing requirements for cross-border mobility and which contributes to the strengthening of the economic position and social cohesion, in particular between…

article

PEIT: a bet on the future

28 July 2006 | By Vicente Gago Llorente, High-speed Technical Coordination Executive Manager, ADIF

On 15 July 2005, the Spanish Government approved the Infrastructure and Transport Strategic Plan 2005-2020 (PEIT). Infrastructure is considered the indispensable support for citizens to have quality transport services, and also an efficient instrument to foster economic development as well as social and territorial cohesion. The PEIT predicts a total…

article

Tunnelling for European high-speed railways

28 July 2006 | By Prof. Dr.-Ing. Alfred Haack, Past President of the ITA – International Tunnelling Association, and Managing Director and Board Member of STUVA – Research Association for Underground Transportation Facilities

Since the 1980s railway traffic for passengers has experienced a renaissance. Especially France and some time later Germany started to construct and operate their first high-speed lines with speeds between 300 and 350km per hour. Later, other European countries followed; such as Italy, Spain and the UK, and even the…

article

Consultancies help out on major projects

28 July 2006 | By James Abbott, Technical Editor

Consultancy practices have an important role in providing technical expertise for railway projects around the globe. Historically, Europe’s big state railways were self-sufficient. All the engineering skills were on hand in-house: when a new project was sanctioned by the government, the state railway would generally be able to design and…

article

On the home straight

31 May 2006 | By Dave Pointon, Managing Director, Union Railways

The UK’s first high speed railway,The Channel Tunnel Rail Link, is entering the final phase of construction. Dave Pointon, Managing Director of Union Railways, reviews progress and looks ahead to finishing the job in 2007.

article

Continuous growth of the Spanish high speed network

23 August 2005 | By Ignacio Barrón de Angoiti, Charge de Mission Grande Vitesse, UIC

The precedent Spanish government started an ambitious plan for the construction of new high speed lines and the upgrade of some existing ones. Now, the new government (which came into power midway through 2004), has decided to continue the project, albeit with some changes.

article

Nürnberg-München high speed line

2 March 2005 | By Eckart Fricke, Director Production II, Railion Deutschland AG and Wolfgang Feldwisch, Head of Large-Scale Projects, DB Netz AG

The Nürnberg-München line via Ingolstadt was entered in the Federal Transport Infrastructure Plan in 1985. The regional planning procedure got underway in July 1989 and in May 1992 the statutory public enquiry for the new-build project was initiated by what was then still Deutsche Bundesbahn. As from 1994, DB Netz…

article

EMU V250 high speed train to connect Belgium to Holland

2 March 2005 | By Carlo Pellegrini, Executive Vice President Engineering and Fabrizio Barbieri, V250 Project-Engineering Manager, AnsaldoBreda SpA

The EMU V250 train is designed for the high speed line (HSL) being constructed which connects Belgium to Holland. This is the first train fully compliant with the TSI interoperability standard as well as with applicable European EN and UIC standards. This train is also the first substantial accomplishment of…