news

London Waterloo to close for two days in December for major upgrades

0
SHARES

Posted: 6 October 2025 | | No comments yet

London Waterloo passengers face festive disruption as the station shuts for two days while Network Rail carries out vital upgrade works.

London Waterloo to close for two days in December for major upgrades

Network Rail has confirmed that London Waterloo will close for two days over the festive period as engineers deliver critical safety and reliability upgrades on one of Britain’s busiest railways.

London Waterloo will close on Saturday 27 and Sunday 28 December, with all trains terminating at Clapham Junction. From Monday 29 December until Sunday 4 January, a reduced timetable will operate while work continues between Queenstown Road and Nine Elms junction.

Over 350 engineers will carry out renewal of track, switches, crossings and conductor rail. Platforms at Queenstown Road station will be altered to fit the new track layout. The programme will also see the installation of fresh ballast and sleepers to strengthen the foundations, alongside improvements to electric power supplies.

Mark Goodall, Wessex route director for Network Rail, said:

We are giving passengers early notice that there will be changes to train services for those travelling to and from central London over the festive period. We are advising passengers to plan ahead and use alternative routes into the capital. We are sorry for the disruption this closure between London Waterloo and Clapham Junction will cause however these works will provide a more reliable journey for everyone who travels on one of the country’s busiest railways.”

Service changes announced include:

  • No trains on Christmas Day and Boxing Day, in line with normal practice.
  • London Waterloo closed on 27–28 December, with trains terminating at Clapham Junction.
  • A reduced timetable from 29 December to 4 January; schedules available from 3 October.
  • Queenstown Road station closed throughout the works.
  • Vauxhall station closed 27–30 December and on 1 January, reopening for New Year’s Eve and fully from 2 January.

Ticket acceptance will be in place on alternative routes, with full details available from National Rail Enquiries and South Western Railway.

For more details on the upgrade works, see Network Rail’s project webpage .

OUT NOW: The Definitive Guide to Rail’s Digital Future

The rail industry is undergoing a digital revolution, and you need to be ready. We have released our latest market report, “Track Insight: Digitalisation.”

This is not just another report; it’s your comprehensive guide to understanding and leveraging the profound technological shifts reshaping our industry. We move beyond the buzzwords to show you the tangible realities of AI, IoT, and advanced data analytics in rail.

Discover how to:

  • Optimise operations and maintenance with real-time insights.
  • Enhance passenger services through seamless, high-speed connectivity.
  • Leverage technologies like LEO satellites to improve safety and efficiency.

Featuring expert analysis from leaders at Nomad Digital, Lucchini RS, Bentley Systems and more, this is a must-read for any rail professional.

Access your copy now!

 

 

 

 

 

Share via
Share via